The
flexibility of the ENVICARE SBR concept
SBR
plant operation is continuously adjustable
in order to maintain full relation between
wastewater load and duration of each sequence
in the operating cycle.
In case of e.g. load increase after construction,
the capacity of an established SBR wastewater
treatment plant can easily be increased
by placing more reactors parallel with the
reactors in operation.
Plants can be designed for removal of organic
matter with built-in possibility for subsequent
upgrading in order to obtain nitrogen and
phosphorous removal even in case of most
stringent discharge demands.

The
reliability of the ENVICARE SBR concept
Flushed-out sludge due to hydraulic overload
of the sedimentation process does not exist,
as no inlet and outlet takes place during
sedimentation and the outlet is effectuated
without disturbance of the underlying sludge
layer.
In case of major variation of load, the
SBR plant are still able to obtain purification
of high stability.
SBR
plant maintenance is minimal, because the
ENVICARE SBR concept does not use any mechanical
or electrical parts in the process volume
but integrates the energy saving characterisation
at the same time.
SBR
operation
|